Prime 309

Prime 309 is a residential project, situated in Antelias. With an ideal location, accessible through Antelias highway, it’s only a few minutes away from the major attractions.

 

Prime 309, with its optimized living spaces, offers a modern lifestyle in a vibrant city.

 

The project consists of 2 blocks of distinguished architectural structure, each comprising of 13 residential floors.

 

Design Criteria

Modern architectural aspect
Structurally designed in accordance to earthquake and wind pressure requirements and standards
Elevations

Double walls providing sound & thermal insulation
Façade finishes are rendered plaster coating
Double glazed aluminum doors and windows, SIDEM 2000 profiles
Internal Finishes

60*60 plain ceramic first choice full body floor tiles & skirting in reception
Lecico or equivalent ceramic floor tiles & skirting for bedrooms, kitchen & bathroom
Two coats finishing plaster to all exposed walls & ceilings
Primer coat, minimum 2 putty coats and paint coats finishing for all exposed walls & ceilings
Internal woodworks

Main apartment door: Solid wood American Oak leave, frame and architraves 45 minutes fire rated, including paint, ironmongery and all accessories needed or Imported ready-made doors
Internal doors: Hollow core flush wood, comprising 6mm MDF on both sides, Swedish hardwood lipping, architraves & frames with white paint, ironmongery and all accessories needed
Kitchen

Quality kitchen lower & upper melamine cabinets (EGGER or equivalent) by a specialized local supplier, granite countertop and stainless steel sink
Air Conditioning

Electrical & drainage outlets installations for split type air conditioning for the reception and the bedrooms
Sanitary Fixtures & Fittings

Top quality Chinese sanitary fixtures or equivalent, with Italian mixers, PPR water supply & riser pipes
Wiring Devices, Disconnects & Panel Boards

Genuine LeGrand with wiring and cables provided by “Cable Liban”
Panel board Schneider Electric or equivalent

Telephone & Telecommunication system

Telephone & data provision for the reception and bedrooms
Audio Intercom system

Urmet or equivalent
Elevators

High speed lift with Italian motor, backed up with a rescue device (UPS)
Water system

150L of 4mm thickness insulated electrical water heater tank
Common collective water tank at basement level in addition to common collective tank at roof level
Waterproofing

All exposed roof and flower beds areas are treated with the highest standards of waterproofing & protection
Security

All common areas are equipped with smoke detectors, smoke dampers and adequate ventilation systems
Common area and apartments’ doors are fire rated; 45 minutes
Fire hose cabinets in common areas
Exit signs & emergency lights in common areas
Common Services

2 parking lot for each apartment
Doorkeeper room
Quality Assurance

The project is supervised by the authorized quality control office BATIPLUS